Work begins at the RNB Portsmouth | 30/07/2013

Fibrwrap UK has been commissioned by BAE Maritime to strengthen a boat launch jetty at its Portsmouth base.

The jetty, which is vital the operations at the port, is a timber structure which will be strengthened with Fibrwrap UK’s innovative composite jacketing system. Engineers will then fill the void with a high-strength grout.

A final wrap of the ground-breaking Tyfo SW1S will be applied to the jackets and brace elements. The project is expected to take eight weeks.

Home     Contact