Carbon Fibre Strengthening for additional loads in a Marine Environment | 26/08/2015

Installation of a new defence radar on the Shell Pier in Gosport highlighted a requirement for the repair and strengthening of a number of concrete pier columns in the splash zone at the end of the pier. Fibrwrap was appointed as principle contractor for the repair and strengthening project that also included diamond drilling and the installation of the superstructure that will carry the new radar. Fibrwrap has carried out specilaist surface preparations, concrete repairs, carbon fibre strengthening and protective coatings as part of the whole scheme.

Project: Shell Pier, Gosport

Client: BAE Systems

Contract Duration: 16 weeks

Scope of Works: Carbon Fibre strengthening of Pier Column

Download Project Brief