East Sussex Bridge Repair and Protection Scheme | 07/03/2017

Two highly important footbridges that form part of the very picturesque walks through East Sussex and are vital pieces of infrastructure for the local authority. Due to the locations of these two bridges, the piles were showing some signs of corrosion and delamination of the concrete, Fibrwrap carried out extensive repairs to the piles and wrapped them in Tyfo SEH Systems for added protection. The works were carried out from pontoons with lightweight materials given the remote locations.

Project: East Sussex Bridge Protection

Client: ESCC

Contract Duration: 3 weeks

Scope of Works: Concrete repair and protection from erosion of bridge piles.