URS/Aecom requested us to carry out the design, supply and installation of our Carbon Fibre Strengthening to a car park slab in Willesden Green, London. For reasons we are not fully aware of the slab had been constructed with insufficient reinforcement in one particular section. The slab carries a roof top garden at first floor level as an extension to a mixed use new construction scheme, below the slab was the resident’s car park. 

Fibrwrap UK designed an FRP strengthening solution that replaced the missing strength, the carbon fibre strengthening system was applied in 600 mm strips to the underside of the slab with our patented Fibr-Anchors utilised for additional anchorage.

A 100m2 area of strengthening works were complete in 2 weeks, the FRP system was then protected against fire using Tyfo CFP system which took another week.

Project: Willesden Green, London

Client: Galiford Try Construction

Contract Duration: 3 Weeks

Scope of Works: Carbon Fibre Strengthening of a slab due to a construction error