Beam Strengthening – Lancaster University | 22/06/2015

Eric Wright Construction are carrying out refurbishment work to the science block known as the Farraday Building at Lancaster University. This refurbishment includes the provision of a new plant room at roof level and this highlighted the requirement for strengthening works to the beams in this area. Fibrwrap UK were commissioned by EWC to strengthen 16 beams in 2 phases using our Carbon Fibre Wrap strengthening system. Phase 1 was complete in summer 2014 and was carried out in just 5 days.

Project: Farraday Building Lancs Uni

Client: Eric Wright Construction

Contract Duration: 3 Weeks

Scope of Works: Beam strengthening with Carbon Fibre fabrics