Cantilever Slab Strengthening – Fire Drill Towers, Suffolk | 22/06/2015

The Towers, built in the 1960s had been constructed with the reinforcement for the cantilevers in the wrong place and with insufficient support. The slabs were showing signs of failure on the cantilevers and at the aperture for the ladder access. Tyfo Fibrwrap Systems were designed and installed by Fibrwrap UK to the top and bottom surfaces

Project: Fire Drill Towers Suffolk

Client: Suffolk County Council

Contract Duration: 4 Weeks

Scope of Works: Strengthening of Slabs and Cantilever Balconies on 3 Fire Station Drill Towers in, Framlingham, Felixstowe and Woodbridge in Suffolk.